Case studies

Real projects, told in full.

Work by Focaloid, the engineering team behind Orlian. Clients aren’t named and the walk-throughs use representative data; the problems, the approach and the reported results are real.

2
Case studies
2
Industries
3
Continents
Every case study comes withAn interactive 3D walk-through

The same story told on a model of the site or the lab: click through it at your own pace, in about four minutes.

01
Facilities managementNorth AmericaAI workflows

Turning spreadsheets, building plans and document folders into a record a technician can ask.

A facilities knowledge platform could hold every asset, drawing and manual, but filling it was manual, site by site, and its drawings could be stored but never answered from. Onboarding capacity had become the limit on how fast it could sell. Focaloid built the AI workflows for both.

−60%
manual onboarding effort
2×
onboarding capacity, same headcount
−70%
time to reach a document or procedure
3×
time to value for the end customer

Outcome figures as reported by the client.

02
Automotive · Tier-1Labs on 3 continentsTest control platform

One record for every physical test, from the engineering request to the result.

Before a supplier puts a part into production, it validates the part in its own test center. Focaloid works on the test control platform that runs these test centers on three continents: orders arrive from engineering on their own, the plan keeps up with the lab, and results go back without being typed twice.

3
continents, one platform
1
record per test, from request to result
Auto
re-planning when a test runs late or a machine goes down
Live
queues on a screen in every lab area

The client’s own figures are confidential, so none are shown here.

From our own delivery

Proof from the platform itself.

Three things we can say about Orlian from using it, the same way we tell them in the executive briefing.

Where a project starts

Start with something real.

None of these start with slides. Each one starts with your own material.

  1. 01Bring one real dataset

    For data-heavy products: one customer’s export, a plan set and a folder of documents, and we show what comes out the other side.

  2. 02A half-day workshop

    For operations like a test lab: your machine list, one product family and one quarter of your current plan, run through the model.

  3. 03Thirty minutes on a live project

    For delivery itself: we open Orlian on a real project and follow one requirement from the goal to production.

Your project

The next case study could be yours.

Tell us what you are building or modernising, and we’ll show you what the first weeks would look like, on your own material.